Is it cheaper to render one elevation at a time?
It can spread the cost, but scaffold and setting up are repeated each time, so the total is higher. Doing the whole house at once is usually the best value if the budget allows.
Every visit means erecting and striking scaffold, possibly a new scaffold licence, protecting the ground and windows again and setting up mixing and waste. Those costs repeat in full, and the elevations rendered later may come from a slightly different batch, so colour matching across corners can be harder. Doing the front first and the rest later can still make sense where the front is failing and the budget is tight, or where the rear is waiting for an extension. If you go that way, ask for the whole house to be priced now with each elevation shown separately, and keep the same system and colour reference for later phases. A clean stop at a corner or a downpipe hides the junction between phases. Scaffold alone is typically £1,500 to £3,500 for a semi, which shows how quickly repeated set up adds up.
Is it cheaper to render in winter?
Not much. Prices reflect materials, labour and scaffold, which don't change greatly with the season. Winter jobs can take longer because of weather pauses, so booking for spring usually works out better.
Render cannot go on below 5°C and needs the temperature rising with no frost for 24 hours, because water in fresh render expands by about 9% when it freezes and breaks the bond. In a London winter that means mornings lost to frost, days lost to rain and scaffold standing longer, and longer scaffold hire costs money. Short daylight hours also cut the working day. Winter is still a good time to get the survey done, agree the price, sort any scaffold licence and fix a spring start date, so the job begins as soon as conditions allow. Preparation work such as hacking off or small repairs can sometimes go ahead in milder spells. If you accept a quote over the winter, check that the price is held for your planned start date and that the date is written down.
Should I render at the same time as other work?
Yes, if you can. Combining rendering with roof work, new windows, gutters or solar panels means sharing the scaffold, which saves money and disruption.
Scaffold is one of the biggest single items on a render job, so sharing it with roofers, window fitters, gutter replacement or solar installers avoids paying for it twice. Order matters. Roof and fascia work usually goes first, then new windows, because frames set the line for beads and reveals. Render follows, and gutters and downpipes go back on last on fresh brackets. Solar panels and new cables should be planned so fixings and cable runs go in before the finish, which avoids drilling through new render. Ask each trade for its dates and agree one programme so the scaffold is not left standing idle. Within the LINX group, LINX Glass and LINX Solar can coordinate windows and panels with the render on one scaffold, and LINX Design and Build can handle wider building work. Tell us about any planned works at the survey.
Why do some renderers charge so much less?
Lower prices often mean no mesh, no beads, a cheaper unbranded product, no manufacturer warranty, or less preparation. It is worth comparing exactly what each quote includes before comparing prices.
The parts of a render job that cost money are also the parts you cannot see once it is finished. Mesh across the whole wall, diagonal patches at window corners, a bell cast bead above the damp proof course, proper stop and corner beads, priming and levelling of hacked off areas, and enough coats at the right thickness all take time and materials. Leaving them out cuts the price and usually shows up later as cracks, hollow areas or water getting behind the render. Other savings come from skipping the scaffold licence, waste disposal or protection, or from a product with no system warranty. Lay the quotes side by side and list for each one the system name, each layer, the beads and mesh, preparation, scaffold and waste. Then ask the cheaper firm to confirm any missing items in writing.
Does a render quote include scaffold?
Ours does. Some renderers quote render only, leaving you to arrange scaffold separately. Always check, as scaffold can be a fifth or more of the total cost.
Our quote covers the scaffold, the scaffold licence where it stands on the pavement, and any lighting or signage that licence requires. It also covers protection, skips or a load and go waste service, and the full render system. When scaffold is left out, the homeowner usually ends up hiring a scaffolder directly, which creates gaps in responsibility over design, timing, alterations and safety checks. Scaffold has to suit rendering, with boards at a sensible distance from the wall and ties placed so they can be moved and the holes made good as work progresses. On a semi, scaffold typically costs £1,500 to £3,500. If a quote says render only, ask who designs and inspects the scaffold, who pays for the licence, and what happens if the job runs past the hire period.
Do you charge for a quote?
No. Quotes and surveys are free. Send us photos to get a guide price first, then we visit to measure and confirm a fixed quote.
The process starts with photos. Send a clear picture of each elevation, a few close ups of any cracks, blown patches or painted areas, and your postcode, and we send a written guide price within 24 hours. If the guide suits you, we arrange a free survey to measure every elevation, test the existing surface for hollow areas, check access, parking and scaffold needs, and look at details such as sills, pipes and the damp proof course. We also bring texture and colour samples. After the visit you receive a fixed written price with the scope set out layer by layer, so you know exactly what is included before you commit. There is no obligation at any stage. Photos taken on a dry day in good light, with the whole elevation in frame, make the guide price far more accurate.
Does rendering need a deposit?
We take a deposit to book your start date, then stage payments as work progresses, with the balance on completion. You never pay for the whole job upfront.
The deposit secures your start date in our programme and allows us to order materials, book the scaffold and apply for any scaffold licence. Stage payments are then tied to clear milestones, such as scaffold up and preparation complete, base coats on, and finish applied, so you only pay for work you can see has been done. The balance is due on completion. All of this is written into the quote before you sign, with each stage and amount listed. Paying in stages protects both sides and keeps the job moving. Be cautious of any renderer asking for most of the money before work starts, or for cash with no paperwork. Ask for an invoice at each stage, and keep the invoices with your warranty documents, because a buyer's solicitor may ask for them when you sell the house.
Can I get a price over the phone?
We can give a rough guide once we have photos of each elevation and your postcode. A fixed price always follows a survey, because wall condition and access affect the cost.
Render is priced on the area of wall and the work needed to prepare it, and both are hard to judge from a description. Photos of each elevation let us estimate the area, see the existing surface and spot obvious problems such as pebbledash, cracks or flaking paint. The postcode tells us about parking, likely scaffold licence needs and travel. From that we can give a written guide price within 24 hours. The fixed price follows the survey because hollow render, the soundness of paint, height, access over a neighbour's land or a conservatory below the work can all change the cost. Published guides help too, for example £6,000 to £9,000 for a terrace front or £10,000 to £16,000 for a 3 bed semi. Include one photo taken from the street and one from the garden.
How can I reduce the cost of rendering?
Render over sound surfaces instead of hacking off, combine scaffold with other work, keep detailing simple, and book for spring rather than waiting for the busy summer months.
The biggest saving is usually keeping the existing surface. Sound painted brick or old render can take a primer, a meshed basecoat and a silicone finish about 10mm thick, with only loose areas scraped back, which avoids hacking off at £25 to £40 per m² and a levelling coat at about £25 per m². Simple detailing also helps, because every extra band, groove or contrasting colour adds labour. Removing satellite dishes, lights and hanging baskets yourself and clearing paths and side access saves time on site. Sharing scaffold with roof, window or gutter work avoids paying for it twice. Spring bookings fill quickly, so getting the survey done early secures a good slot. Avoid saving money by dropping mesh, beads or the system warranty, because repairing failed render later usually costs far more than doing the job properly first time.