What is external wall insulation?

External wall insulation (EWI) is insulation board fixed to the outside of the wall, then covered with a meshed basecoat and a render finish. It keeps heat in, removes cold spots and gives the house a brand new exterior in one job, without losing any room inside.

A typical system starts with a starter track fixed level just above the damp proof course. Insulation boards are then bonded to the wall with adhesive and secured with mechanical fixings driven into the masonry. The boards are rasped flat, corners and openings get beads, and a basecoat is applied with glass fibre mesh fully embedded, with diagonal mesh patches at window and door corners to stop cracks forming. A primer follows, then a thin coat finish such as EWI Pro silicone render, which comes through coloured so it needs no painting. Because the insulation wraps the outside, the masonry stays warm, which cuts the cold spots where mould tends to form inside. We supply EWI Pro systems as a complete package so adhesive, boards, mesh and finish are designed to work together, which is what keeps the 10 year warranty valid.

Is external wall insulation worth it?

For solid wall houses, usually yes. Solid walls lose far more heat than cavity walls, so EWI makes a noticeable difference to comfort and heating bills. It makes most sense when you would be re rendering anyway, because you pay for scaffold and a new finish only once.

An uninsulated solid brick wall about 230mm thick has a U value of roughly 2.0 W/m²K, and 90 to 100mm of insulation brings that close to 0.30 W/m²K, so heat loss through the walls drops sharply. As a guide, EWI runs at £200 to £260 per m², or about £20,000 to £26,000 for a 3 bed semi, against £10,000 to £16,000 to simply re render the same house. The gap is smaller than it looks once you remember that scaffold, preparation and a new finish are paid for in either case. Insulation installed in homes is also zero rated for VAT under the energy saving materials relief until 31 March 2027, while ordinary rendering carries 20% VAT. EWI is less worthwhile on a house that already has filled cavity walls, or where a narrow boundary leaves no room for the extra thickness.

How do I know if my house has solid walls?

Look at the brick pattern. If you can see the short ends of bricks in the face of the wall, it is usually solid. Most London homes built before the 1930s have solid walls, and many 1930s houses do too. A wall thickness of about 230mm at a door or window also points to solid brick.

The patterns to look for are Flemish or English bond, where rows of full length bricks alternate with short ends, called headers, which tie the two layers of brick together. A cavity wall shows only the long faces of the bricks, laid in what is called stretcher bond. Rendered or pebbledashed houses hide the brickwork, so measure the wall at an open door or window frame instead, allowing for the render outside and plaster inside. A cavity wall is usually thicker than a solid one. Your EPC certificate may also describe the walls, though older certificates are sometimes based on assumptions. Inside, solid walls tend to feel cold to the touch in winter and are often where condensation and mould appear first. At our survey we confirm the construction by checking reveals, the loft and any exposed brick at the base before recommending EWI or a render system.

How thick is external wall insulation?

Usually 90 to 100mm of insulation plus about 10mm of render. On a solid brick wall that typically brings the wall close to the building regulations target of 0.30 W/m²K. Thicker boards are possible where space at the boundary allows.

The thickness is set by the U value you want and the space you have. At ground level, a path or a neighbour's boundary can limit how far the wall can come out, and some councils take a view on how much a front elevation changes. Every extra millimetre also affects detailing, because sills, roof verges, downpipes and the eaves overhang all have to suit the new face. Where the eaves are shallow, the roof edge may need extending so rainwater still clears the wall. Around window and door reveals, a thinner board is usually used where the frame leaves little room, which still cuts the cold bridge there. We set out the build up for your house at the survey, so you can see where the finished wall line will sit before committing, and we check that doors, gates and meter boxes still work with it.

Which insulation is best for EWI: EPS or mineral wool?

EPS is lighter, cheaper and slightly more efficient per mm. Mineral wool, such as Rockwool, is non combustible and more breathable, so it is preferred on old solid walls and required on taller residential buildings. We advise based on your wall, the building height and your budget.

EPS boards are rigid, easy to cut and rasp flat, and keep cost down on standard brick houses where fire height rules do not come into play. Mineral wool is heavier and denser, so it needs more fixings and careful handling, but it lets water vapour pass through and will not burn, which suits older walls that need to dry outwards. On a solid wall with old cement render, Rockwool with a breathable PRB or silicone finish is usually our recommendation. Some jobs combine the two, with mineral wool used as fire breaks around openings or at party walls. Whichever board is chosen, it must be part of one tested system with matching adhesive, fixings, mesh and render, because mixing products from different suppliers can void the warranty. Ask any installer to name the full system they are quoting, product by product, and to put it in writing.

Can external wall insulation go over existing render?

Often, yes. If the old render is sound enough to hold the fixings, the insulation can go straight over it and no hack off is needed. On houses with failing cement render we often propose 90mm Rockwool insulation with a PRB render over the existing render.

Before fixing over old render, we tap test the whole surface and drill trial holes to see how it holds. Hollow patches are cut out and made good, and badly bulging areas are hacked off so the boards sit flat. The mechanical fixings pass through the old render into the brick or block behind, so they carry the load even where the render bond is weak. Sound pebbledash can be treated the same way, which saves the cost and noise of hacking off. This is often the most cost effective route on solid wall houses with failing cement render, because the money that would go on hacking off at £25 to £40 per m² plus a levelling coat at about £25 per m² goes towards insulation instead. Any damp or cracking caused by leaks, gutters or movement must be fixed first, or the problem carries on behind the new system.

What happens to windows, sills and pipes with external wall insulation?

Reveals are insulated, sills are extended or replaced so they project past the new wall face, and downpipes, vents, lights and meter boxes are moved out. The roof edge may also need extending. We include all of this detailing in our quote.

Reveals usually take a thin insulation board so the edge of the window does not become a cold spot. New sills are fitted under the frame with enough projection and a drip so water falls clear of the render below. Downpipes and soil stacks are refixed on brackets long enough to clear the new face, and gas and electric meter boxes may need moving by the supplier or a qualified trade. Extract fans and boiler flues get sleeves through the insulation so they keep venting properly. At the top, the roof verge or eaves may need a trim extension so the insulation is covered and rainwater cannot get behind it. If your windows are due for replacement, it pays to do them first or at the same time, as the new frames can sit further forward in line with the insulation and give a neater, warmer reveal.

Does external wall insulation cause damp or condensation?

Fitted properly, it reduces condensation by keeping the wall warm. Problems come from poor detailing at sills, roof edges and the base, or from vapour tight systems on walls that need to breathe. Mineral wool with a silicone render is the most breathable option.

Condensation forms when warm moist air meets a cold surface, whether that is the inside face of a wall or a point within it. External insulation moves the cold point outside the masonry, so the brick stays warm and dry. The risks sit at the edges. A sill without enough projection, an unsealed window joint or a roof edge that lets rain behind the boards can trap water against the wall. At the base, the system stops above the damp proof course with a bell cast bead so it does not bridge it. On solid walls that already have rising or penetrating damp, the cause must be found and fixed first, because insulation will not dry out a wet wall on its own. Good ventilation inside also matters, so working extractor fans in kitchens and bathrooms should be part of the plan. We check for existing damp at the survey.

Are there grants for external wall insulation?

ECO4 can still fund solid wall insulation for eligible lower income households until the scheme closes on 31 December 2026. The Great British Insulation Scheme closed in March 2026, and the government's Warm Homes Plan takes over from 2027. Check your eligibility with your energy supplier or Ofgem.

ECO4 is delivered through energy suppliers and their approved installers, and eligibility usually depends on benefits, income and the property's EPC rating, so the first step is checking with your supplier or an official scheme finder. Grant funded work must be carried out by an installer registered for that scheme, so any grant route has to be arranged before a contractor is booked or work starts. Applications take time to process, and the closing date leaves little room, so act early if you think you qualify. If you do not, the VAT relief still helps, since insulation installed in homes is zero rated until 31 March 2027, while ordinary rendering carries 20% VAT. Keep an eye on the Warm Homes Plan from 2027, as details of who it will help are still emerging. Your local council may also run its own retrofit schemes, so check their website too.

Do I need planning permission for external wall insulation?

Often not on a house, but councils differ on how big a change in appearance needs permission, so check first or apply for a Lawful Development Certificate. You will need permission or consent for listed buildings, in conservation areas, for flats, and where an Article 4 direction applies. Building regulations also apply.

The usual test is whether the new materials give a similar appearance to the existing house. Covering red brick with render is a visible change, so some councils want an application while others treat it as permitted development, and a Lawful Development Certificate gives written certainty. On the building regulations side, EWI counts as renovating a thermal element, so it must meet the insulation standard where practical. Some EWI installers are registered with a competent person scheme and can self certify qualifying work; otherwise a building control application is needed before work starts. Keep the completion certificate with your house papers, as a buyer's solicitor will ask for it. Where the insulation would project over a boundary or onto a public pavement, you also need the owner's or the council's agreement. We discuss these points at the survey so the programme allows time for any approvals.