Can you render a block of flats?
Yes. Blocks are usually arranged through the freeholder or managing agent. We price from a survey or the agent's specification and plan access, scaffold and resident communication.
A block is a shared building, so decisions sit with the freeholder or managing agent, who normally appoints a surveyor or uses their own specification. We survey the whole building, tap test the existing render for hollow areas, note cracks, sills, copings and rainwater goods, and price a scope that can be clearly explained to leaseholders. Scaffold on a block often needs a licence where it stands on the pavement, and sometimes access through neighbouring land, which we arrange. Before work starts we provide a resident notice explaining dates, which windows will be sheeted and when, and who to contact with questions. Work is sequenced elevation by elevation so disruption moves around the building. Agents find it helpful when we include a repair allowance by area, so unexpected hollow render can be dealt with without delaying the job.
Do leaseholders have to pay for rendering?
Usually, through the service charge, if the lease makes them responsible for external repairs. Where any leaseholder's share is over £250, the landlord must follow the Section 20 consultation process first.
Who pays depends on the wording of each lease, so the lease is the first document to check. Most leases put external walls and structure in the landlord's hands, with the cost recovered through the service charge in shares the lease sets out. If any single leaseholder would pay more than £250, the landlord has to complete Section 20 consultation before starting, or risk being unable to recover more than that amount from each leaseholder. A reserve fund built up over previous years can reduce the bill. Adding insulation at the same time changes the cost, so leaseholders often ask whether it is included and why. We can price render repair and insulation options separately, which helps the landlord explain the choice. Leaseholders who are unsure of their position can ask the managing agent for the relevant lease clause and the breakdown of the estimate before the works are agreed.
What is Section 20 consultation?
It is a legal process landlords must follow before major works where any one leaseholder would pay more than £250. It involves notices, a chance to comment and usually more than one quote. We can provide quotes to suit the process.
The process runs in stages. The landlord first serves a notice of intention, describing the works and why they are needed, and invites leaseholders to comment and nominate a contractor within a set period. The landlord then obtains estimates, including one from a contractor the leaseholders nominated, and serves a further notice setting out the estimates and responses to any observations. Leaseholders get another chance to comment before a contractor is chosen. Skipping the process normally limits what the landlord can recover from each leaseholder to £250 unless a tribunal grants dispensation. As a contractor, our role is to provide clear estimates with a scope that matches the specification, so leaseholders can compare like for like pricing. We keep our quote valid long enough to cover the consultation period. Ask your managing agent for the timetable before anyone books scaffold.
Can landlords use external wall insulation to meet EPC rules?
Yes. Private rented homes in England must currently meet a minimum EPC rating, and solid wall insulation is one of the most effective ways to raise it. The government plans higher standards, so check the latest rules before deciding.
Solid wall homes lose a lot of heat through their walls, and an uninsulated solid brick wall about 230mm thick has a U value of about 2.0 W/m²K. Adding 90 to 100mm of insulation brings it close to the 0.30 W/m²K target for upgraded walls, which can make a real difference to the EPC, particularly in older terraces and semis. Insulation installed in homes is currently zero rated for VAT under the energy saving materials relief until 31 March 2027, while ordinary rendering carries 20% VAT. Funding schemes change often, and ECO4 closes on 31 December 2026, with the Warm Homes Plan expected from 2027. Before committing, get a fresh EPC assessment that models the walls, roof, windows and heating together, so you can compare the cost of each improvement against the rating it achieves.
Can you render a house in multiple occupation?
Yes. HMOs are rendered like any other house, but with more people living there, we plan access, noise and communication with tenants carefully. Landlords often combine it with insulation to improve the EPC.
HMOs usually have more people coming and going, more bikes and bins at the front and often more cars, so access needs planning before scaffold goes up. We agree with the landlord how tenants will be told, put a notice in the communal hall with dates and a contact number, and keep the main entrance and fire escape routes clear at all times. Bedroom windows may be sheeted for periods, so tenants need to know when. Many HMOs are older solid wall houses where heat loss through the walls adds to running costs, so landlords often look at external wall insulation with a render finish at the same time. Insulation can also lift the EPC and make rooms warmer and less prone to condensation and mould. Send photos of each elevation and we can price render alone and render with insulation.
How long does it take to render a block of flats?
A small block of four to six flats typically takes 4 to 8 weeks on site, depending on height, access and repairs. For leasehold blocks, allow extra time beforehand for Section 20 consultation and any planning permission.
Time on site depends mostly on how much existing render has failed and how easy the building is to reach. Scaffold goes up first and comes down last. Hacking off and repairs come next, and the amount only becomes clear once we can tap test from the scaffold, so we build a repair allowance into the programme. Each coat then needs curing time, which is longer in cold or damp weather, and we only render at 5°C and rising with no frost expected for 24 hours. Weather is the biggest single cause of delay, so blocks are best programmed between spring and early autumn. Before any of this, Section 20 consultation takes a number of weeks, and planning permission may be needed for a change in appearance, particularly in conservation areas. Agents should allow for both when setting dates with residents.
Can you work with a managing agent?
Yes. We regularly deal with managing agents, providing surveys, specifications, quotes, insurance documents and progress updates in the format they need.
Managing agents need information they can pass on to freeholders and leaseholders without rewriting it. We provide a survey with photographs and a clear scope, a written price broken down so repairs, new render, insulation and scaffold can be seen separately, and our insurance documents and RAMS before work starts. During the job we send progress updates with photographs at agreed intervals and raise any extra work, such as hollow render found once the scaffold is up, with photos and a price before doing it. That way the agent can approve variations properly and keep the service charge account clear. On completion we hand over the warranty and a record of what was done, which helps with future maintenance planning. Tell us how your firm likes reports set out and we will follow it.
Do you render mansion blocks?
Yes, where render is part of the original façade or a repair is needed. Many London mansion blocks are brick with render or stucco details, which we repair to match.
London mansion blocks usually combine red or yellow brick with rendered or stucco bands, window surrounds, cornices and balcony fronts, and these details often fail first because they catch the most water. Typical problems are cracks at the ends of bands, hollow patches on balcony soffits, broken mouldings and old cement repairs that do not match. We repair in materials that suit the original, using lime where the original is lime, and we match profiles by taking templates from sound sections or by replacing plain runs with ready made EPS profiles where that suits the building. Matching the colour of aged render is hard, so painted details are usually redecorated across a whole elevation for an even look. Scaffold on a tall block is a large part of the cost, so it makes sense to combine render repairs with other external work.
Can tenants stay while a rented house is rendered?
Yes. Tenants can stay in place, as with any homeowner. Landlords should give notice of the works and the scaffold, and we keep access to doors clear throughout.
Rendering is external work, so tenants carry on living normally for most of the job. The noisiest stage is hacking off old render, which is usually short, and we keep it to sensible daytime hours. Landlords should give tenants written notice with the expected dates, explain that scaffold will be up and that windows may be sheeted for periods, and confirm how they can reach the contractor with any concerns. Tenants should move cars, bins, bikes and garden items away from the walls before work starts, and keep windows shut on the days we hack off or spray. We protect the main door, frames, paths and plants and clear up at the end of each day. A landlord who walks round with the tenants at the start avoids most later complaints.
Can you provide a report on render condition for a block?
Yes. We can survey and report on the condition of render and stucco, with photographs, priorities and a costed repair plan, which helps agents plan service charge budgets.
A condition report gives an agent or freeholder a clear basis for planning, budgeting and Section 20 consultation. We inspect each elevation, tap test accessible areas for hollow render, and record cracks, staining, failed sills and copings, blocked gutters, algae and any signs of damp getting behind the render. Each defect is photographed and located on a simple elevation sketch, then given a priority, from urgent safety items where render could fall, to repairs needed soon to stop water getting in, to longer term work that can be planned. The costed plan separates these so the agent can spread work over time if needed. Upper areas often can only be inspected properly from scaffold or a cherry picker, so we state clearly which parts were seen close up and which only from the ground. Ask for the report before setting the following year's service charge budget.