When do I need lime render?
Lime is needed on listed buildings, very old soft brick, stone, rubble walls and timber frames, where the wall must breathe and move. On most 1930s solid brick houses, a breathable modern system does the job well and costs less. We tell you honestly which your house needs.
The test is the wall itself. Soft handmade bricks, lime mortar joints that crumble when scratched, flint, rubble stone or timber framing all need a render that lets moisture out easily and moves with the building. Signs that a wall cannot breathe include damp patches, mould inside, peeling paint, musty smells, soft timber and cracking. A 1930s house built with harder machine made bricks and cement mortar behaves differently, and a modern breathable render or insulation system suits it well. Listed buildings will usually be expected to have lime regardless. Where cement render is already on an old wall, it is usually removed before a lime system goes on, so that moisture is not trapped between the two. If unsure, photograph exposed brick and mortar at the base or under a sill and send it to us.
What is lime render?
Lime render uses lime rather than cement as the binder. It is softer, more flexible and very breathable, so moisture leaves the wall freely. We use the PRB lime range, including Primchaux PE, Tradi GP and Tradi Lisse.
Lime hardens largely by absorbing carbon dioxide from the air, so it gains strength over weeks rather than hours. That slower set is why it stays flexible enough to take small movements in old walls without cracking. On site, the wall is cleaned of loose material and dampened, then the PRB lime products are applied in successive coats to build up and true the surface, with Tradi Lisse used where a smooth finish such as stucco is wanted. Each coat is kept damp and shaded while it cures, because frost, strong sun or drying wind can ruin it. Lime also has a degree of self healing, as moisture can carry free lime into fine cracks where it hardens again. The exact build up depends on how exposed the wall is and what it is made of, and we agree the finish with you using samples.
Why shouldn't cement render go on old buildings?
Hard cement render is stronger than old bricks and lime mortar. It cracks, lets water in behind, then stops it drying out, so the wall stays wet and the brick face can crumble. Old walls need a render that is softer and more breathable than the masonry behind it.
Old walls were built to get wet and dry out again through soft brick and lime joints. Cement render seals the face, so moisture moving out from inside, and rain getting in through hairline cracks, gets trapped behind it. In winter that trapped water freezes and expands by about 9%, which pushes the brick face off in flakes, a process called spalling. You often see this when old cement render is hacked off, with damaged brick faces and wet, sandy mortar underneath. Inside, the same wall may show damp patches, blown plaster and salt deposits. The usual fix is to remove the cement carefully by hand, let the wall dry, repair damaged bricks and joints in lime, then apply a breathable render. On walls built with harder bricks and cement mortar, such as many 1930s houses, a breathable modern system can be the better choice.
What is stucco?
Stucco is a smooth render finish used on Georgian and Victorian fronts, usually painted cream or white and often lined to look like stone. Whole streets of it survive in Kensington, Belgravia, Pimlico and St John's Wood.
Stucco was used on fine London terraces as a cheaper way to give brick houses the look of cut stone. Traditionally it was a lime based render applied over brick and finished smooth, with cornices, window surrounds and string courses formed in the same material. Many stucco fronts have since been patched with cement or painted with impermeable paint, which can trap moisture and cause the cracking and blistering seen on older terraces. Before repairs, we tap the surface for hollow areas, check the condition of the mouldings and note any earlier patches that do not match. In conservation areas, the council will usually expect the original colour scheme and detailing to be kept. Stucco repair often goes hand in hand with redecorating, so plan both together and share one scaffold, which saves a second set of access costs.
What is the difference between plain and rebated stucco?
Plain stucco is a smooth, sponged lime render. Rebated stucco is cut with recessed lines so it looks like blocks of ashlar stone. Rebated stucco takes much longer to set out and form, so it costs more.
Rebated stucco is set out with horizontal and vertical joints that copy the coursing of real stone blocks, usually on the ground floor of grand terraces, with plain stucco above. The lines have to be measured from the existing pattern, kept dead level and aligned with window heads and sills, then cut or formed while the lime is still workable. Each joint is finished crisply and the faces between are sponged to a smooth, even texture. Plain stucco needs just as much skill to keep flat and true, but without the setting out and joint forming it moves faster. When repairing part of a front, matching the existing joint width and depth is what makes the repair disappear. We photograph and measure the rebates at the survey so the new work lines up with the original and with the house next door.
Can you repair stucco mouldings and cornices?
Yes. Mouldings and cornices can be run in place with a template matched to the existing profile. Alternatively, we can source ready made EPS profiles that are bonded, meshed and rendered over, which is quicker and cheaper. We quote either option.
For a run in place moulding, a metal template is cut to the existing profile, taken from a sound section or a matching house nearby, and drawn along a timber rail through wet coats until the shape is built up. It is skilled, slow work, and it gives an exact match on listed or prominent buildings. Small damaged sections can often be repaired in place by building up in layers. EPS profiles are factory cut to match, fixed with adhesive, then meshed and coated, so they go up quickly and weigh little. They suit modern render systems, rebuilding missing details on unlisted houses and new build features, though a conservation officer may insist on traditional materials. Before any repair, we look for what caused the damage, such as a failed lead flashing above a cornice, so water does not destroy the new work.
How long does lime render take to apply?
Longer than modern render, because each coat must cure before the next goes on, often several days between coats. Lime also has to be protected from drying too fast and from frost, so lime work is best done between late spring and early autumn.
Each lime coat has to firm up and begin to set before the next goes on, and the gap depends on temperature, humidity and how thick the coat is. Thin coats cure better than thick ones, so lime is built up gradually. Between coats, the surface is lightly scratched or keyed to help the next layer bond, and kept damp with a fine mist to stop it drying too fast. The scaffold is usually wrapped in hessian or sheeting to shade the wall from sun, wind and rain. Lime needs at least 5°C and rising, with no frost for 24 hours, and fresh lime can still be damaged by frost for weeks after application, which is why late autumn and winter starts are avoided. On a typical house front, expect lime work to take noticeably longer than a modern system, and allow for the scaffold staying up throughout.
Is lime render more expensive?
Usually yes, because it needs more coats and more time on site. The extra cost is worth it where the building needs lime. Where it doesn't, a modern breathable system gives an excellent result for less.
The material cost is only part of it. Lime needs more coats, longer gaps between them, damp curing and weather protection, so labour and scaffold hire run for longer. Stucco details, rebated joints and moulding repairs add further skilled time. Where cement render has to come off first, careful hand removal to protect soft bricks takes longer than on a modern wall. Against that, using lime where the wall needs it prevents the trapped damp and brick damage that make repairs far costlier later. On a 1930s house with sound hard bricks, our standard render system at £75 to £110 per m² plus VAT is usually the better value. Ask any contractor to explain why they are recommending lime or a modern system for your particular walls, and what they believe the wall is built from.
Can you render a listed building?
Yes, with listed building consent and a specification agreed with the conservation officer, usually lime based to match the original finish. Carrying out works to a listed building without consent is a criminal offence, so we always confirm consent is in place first.
The conservation officer will usually want a method statement covering how existing render is removed, what is repaired and the exact mix, colour and finish proposed. Sample panels are often made on site so the officer can approve the texture and colour before the main work starts. Small like for like repairs sometimes need no consent, but anything that affects the character of the building does, and the council decides where that line falls, so ask before assuming. Historic England guidance and the council's conservation team are good sources if you want to understand the process. Consent conditions may also cover details such as removal methods and how new work meets old. We can work with your architect or heritage consultant on the specification and keep a photographic record of the work for your file. Allow time in your plans for consent to be granted.
Can lime render be painted?
Yes, but only with breathable finishes such as limewash or mineral silicate paint. Ordinary masonry paint seals the surface and undoes the benefit of lime.
Limewash is the traditional finish, made from lime and water with natural pigments, applied in several thin coats onto a dampened wall. It is soft and chalky and needs renewing every few years, but each coat lets the wall breathe and helps fill fine cracks. Mineral silicate paint bonds with the surface, lasts longer between redecorations and comes in a wide colour range, though it must be compatible with the lime underneath. New lime render should be left to cure fully before painting, and any paint already on the wall should be identified, because acrylic or plastic masonry paint has to come off before a breathable finish will work. If you are repainting a lime house, try a small test area on a hidden elevation first to see how the paint takes and how the colour dries before you commit to the whole house.