Which render is best for a new extension?
For blockwork extensions, a monocouche or silicone system over a basecoat gives a durable, low maintenance finish that can be matched to the house. For timber frame extensions, a render carrier board system is needed.
The choice usually comes down to how the extension is built and how it needs to sit against the existing house. On new blockwork we normally apply a PRB basecoat with glass fibre mesh, then either a monocouche or a thin silicone finish, so the whole wall is reinforced where new and old meet. Through coloured finishes need no painting. If the main house is painted brick or old render, we can bring both up to the same finish so the colour and texture read as one building. At the junction with the old wall we form a movement joint or a neat stop bead instead of running the render across in one sheet, because new and old structures settle differently. We bring texture and colour samples to the survey and can show the extension in two colours from a photo before you decide.
Can you render a timber frame building?
Yes, using a render carrier board fixed on battens over a ventilated cavity, then a meshed basecoat and finish. Render must never go directly onto timber or plywood.
Timber needs to stay dry and to breathe, so the build up matters as much as the finish. A breather membrane goes over the sheathing, then treated vertical battens create a drained and ventilated cavity, and the carrier board is screwed to the battens with the joints taped or meshed as the board maker requires. The basecoat then takes full glass fibre mesh, with extra diagonal mesh patches at window and door corners, before the finish coat. Render applied straight onto timber or plywood traps moisture against the frame, and the warning signs come later, such as damp patches, mould, peeling paint, musty smells, soft timber and cracking. If your timber frame extension is still at drawing stage, ask your designer to show the cavity, membrane and board on the wall section so it can be priced properly.
What is a render carrier board?
A render carrier board is a cement based or similar board fixed to timber or steel framing, designed to take a render system. It creates a stable, moisture resistant background where traditional masonry isn't present.
Carrier boards are used wherever there is no masonry to render onto, typically timber frame extensions, steel framed buildings, dormer cheeks, bay window panels and infill panels. Most are cement bonded or similar mineral boards that stay stable when wet and will not rot. They are fixed with corrosion resistant screws to battens or rails at the centres the board maker sets, leaving a ventilated cavity behind. Joints between boards are the weak point, so they are staggered, kept clear of window corners where possible and reinforced with mesh before the full meshed basecoat goes on. Board, fixings, basecoat and finish should come as one tested system from compatible manufacturers, because mixing parts can put a warranty at risk. We check the board type and fixing layout on the drawings before pricing, since that decides the basecoat we use.
Can you render insulated concrete formwork or SIPs?
Yes. Buildings made from insulated concrete formwork, structural insulated panels or similar systems need render specified to suit the outer face. We follow the manufacturer's guidance and the render system's requirements.
These build methods have very different outer faces, and the render has to suit each one. Insulated concrete formwork usually leaves expanded polystyrene on the outside, so it is treated like an EWI board, with a basecoat, full mesh and a silicone or similar finish. SIPs normally have an OSB face, which must never be rendered directly, so a membrane, battens and a carrier board go on first, much like a timber frame. In each case the system maker publishes guidance on fixings, mesh, movement joints and the finishes they allow, and the render maker sets its own rules, so we check both agree before we price. Where the two conflict, we raise it with the designer early. If you are building with one of these methods, send the wall section and the system maker's render guidance along with your drawings.
How soon can a new blockwork wall be rendered?
New blockwork should dry out and settle before rendering, usually a few weeks depending on weather. Rendering too soon can trap moisture and lead to cracking as the wall shrinks.
Blocks and mortar hold a lot of construction water, and they shrink slightly as they dry. If render goes on too early, that shrinkage pulls on the render and shows as cracks along the block joints, and trapped moisture can cause patchy colour in through coloured finishes. Drying time depends on the block type, the weather and whether the wall was protected from rain during the build, so a wall built in a wet winter takes longer than one built in summer. Before we start, we check the wall by eye and touch, look for dark damp patches and confirm the mortar has fully hardened. Covering the tops of new walls during wet weather speeds things up and keeps the blocks from soaking. On a tight programme, tell us when the shell will be complete and we can plan the render slot around a realistic drying period.
Do new build renders need movement joints?
Yes, where the structure needs them, for example at junctions between different materials, at long runs of wall and where the building has structural movement joints. The render must follow those joints rather than bridge them.
Every building moves a little with temperature, moisture and settlement, and render is a thin rigid skin that cracks wherever movement concentrates. Typical places are where an extension meets the original house, where the wall changes from masonry to timber or steel, at floor zones on framed buildings and along long uninterrupted runs. The structural engineer or architect sets out the building's joints, and we carry them through the render using purpose made movement beads so the joint stays neat and weathertight. Long elevations may also need extra render joints even where the structure has none, and these can be placed to line up with windows or downpipes so they look intentional. Bridging a joint with continuous render almost always leads to a straight crack along its line before long. Ask your architect to mark the joints on the elevations so they are priced and agreed before work starts.
Can you render over a mix of brick and block?
Yes, but different materials absorb water and move differently, which causes cracking if not dealt with. A basecoat with mesh across the whole wall, or extra mesh at the junction, solves it.
Brick and block absorb water at different rates, so a single coat of render dries unevenly and can show the outline of each material through the finish, a problem known as grinning. They also expand and shrink by different amounts, which concentrates stress along the junction line and cracks the render there. Our approach is to prime or level the whole wall so suction is even, then apply a basecoat with glass fibre mesh across the full elevation, with the mesh lapped and extra mesh over the junction itself. Where the change of material is also a structural change, such as an extension meeting the main house, a movement joint is the better answer. If you are planning a mixed wall, tell us early so the right primer and mesh are included in the price.
Will my render warranty cover a new build?
Yes, when the whole job is done with one manufacturer system to their specification. We keep one PRB specification across every face of a new build, including lightwells, so the warranty covers it all.
Manufacturer backed warranties depend on the whole build up coming from one system, applied to that maker's specification with their approved primers, beads, mesh and finishes. Switching to a different product partway through, for example a different monocouche in a lightwell or another brand on a rear elevation, can leave parts of the building uncovered or create arguments over which product failed. That is why we keep one PRB specification throughout, from the front elevation down to the lightwells, so the client gets a single 10 year product and workmanship warranty. We keep records as each area is completed, including the products used and photographs of key details such as mesh at corners and beads above the damp proof course. When comparing quotes for a new build, ask each contractor whether one warranty covers every elevation and what records they will hand over.
Do you work for self builders?
Yes. We can price from your drawings, advise on the right render system for your wall build up, and fit around your programme and other trades.
Self builders often manage several trades at once, so we try to make the render package simple to slot in. From your drawings we measure the areas, check the wall build up and recommend a system that suits it, whether that is blockwork, timber frame with carrier board, or insulated formwork. We give you a written price with clear clarifications and exclusions, and tell you what needs to be finished before we arrive, such as windows fitted, sills and copings in place, fascias done and services through the wall. We arrange scaffold as part of our price, or work from yours if it suits our access. A useful tip is to fix external lights, meter boxes and cable entries in their final positions before rendering, so nothing has to be cut out afterwards.
Can render be used on a basement lightwell?
Yes, though lightwells are damp, shaded and hard to access, so detailing matters. We use the same system specification as the rest of the building and pay close attention to the base, drainage and any waterproofing below.
Lightwells are among the hardest areas of a London house to keep dry, because rainwater collects at the bottom, sunlight rarely reaches the walls and splashback keeps the lower section wet. Before rendering we check that the floor drains freely and falls away from the walls, and that any waterproofing to the retaining walls below ground is complete and lapped correctly with the render above. The render stops on a bead clear of the floor so it does not wick water up, and a dark plinth colour hides splash marks. Access is often limited, so we plan scaffolding or platforms that fit the space and protect the windows and doors that open into it. We use the same PRB specification as the rest of the building so one warranty covers the whole job. Cleaning the lightwell drain regularly is the simplest way to protect the render once it is finished.