What time do renderers start work?
Usually around 8am. Most London councils allow noisy work between 8am and 6pm on weekdays and 8am to 1pm on Saturdays, with none on Sundays or bank holidays. We work within those hours.
Most of our days begin with setting up, mixing and protecting, so noisy work such as hacking off or using breakers starts no earlier than the permitted hours. In summer we start as early as the hours allow on the shaded side and follow the shade round the house, because render applied in hot sun dries too fast. In winter, the start can be delayed until frost has cleared and the temperature is rising, since render needs at least 5°C. Some councils set stricter hours in particular areas, and scaffold erection on a busy road may be timed to suit the licence. We tell you the expected working hours at the start of the job and give notice of noisy days, so you and your neighbours can plan around them. Let us know about any regular quiet times, such as a baby's nap.
Where will the team park?
We plan parking at survey. Where there is no driveway, we use local parking permits or bays and include any suspension costs in the quote.
Parking is often the hardest part of a London job, so we look at it at the survey alongside scaffold access. If you have a driveway, we usually need space for a van and sometimes a skip, so cars may need to move for the duration. Without a driveway, we check controlled parking zones, permit rules and any loading restrictions, and where needed we apply to the council for a bay suspension or visitor permits. Skips on the road need their own permit, and a load and go waste service can avoid that on tight streets. Deliveries are timed to avoid blocking neighbours. Let us know about anything that affects access, such as a shared drive, school run traffic or a narrow road where large vehicles struggle. Any parking costs are shown in the quote, so they never come as a surprise.
Do you need to use my toilet and electricity?
We may need an outdoor power socket for tools, and we will agree welfare facilities with you at survey. On longer jobs we can bring a portable toilet.
Render mixers, power tools and lighting need power, so an outdoor socket on a safe circuit saves trailing cables through windows. Where there is none, a cable can be run from an indoor socket through a gap that still lets doors and windows close, or a small generator can be used, which is noisier. Water is also needed for mixing and cleaning, usually from an outside tap. If there is no outside tap, ask a plumber to fit one before we start, which is handy afterwards too. On welfare, some clients are happy to offer a downstairs toilet, while others prefer a portable unit, and both are fine. We agree this at the survey so nothing is awkward on the first morning. Tell us if the outdoor socket trips easily, so we can check it before work starts.
Will the scaffold make my house less secure?
We use scaffold alarms or ladder guards where needed, and the scaffold is checked regularly. Keep upstairs windows locked while it is up, and tell your insurer about the works.
Scaffold gives easy access to upper windows, so the main risk is opportunist entry, especially at night and over weekends. Ladders are removed or locked out of reach at the end of each day, and ladder guards stop the lower lifts from being climbed. Scaffold alarms with motion sensors suit houses that are more exposed, such as corner plots or homes left empty. The scaffold is inspected after it goes up, after any alteration and at regular intervals while it stands. On your side, lock upstairs windows and any roof access, avoid leaving valuables visible from the boards, and keep outside lighting on at night. Most home insurers want to know about building work, so a quick call before the scaffold goes up keeps your cover in place. Tell us if you will be away during the job, so we can check the house is secure each evening.
Do you leave the site tidy every day?
Yes. We clear waste, sweep paths and keep access to doors clear at the end of each day, so your home stays usable.
Render work creates dust from hacking off, splashes from mixing and offcuts of beads and mesh, so protection is set up before anything starts. Paths, patios and plants close to the wall are covered, windows and doors are sheeted, and neighbouring walls and nearby cars are protected where needed. Mixing is done on boards or in a set area, never directly on paving. At the end of each day waste goes into the skip or bags for collection, paths are swept and entrances are cleared, so you can come and go safely. When the job finishes, protection is removed, windows, sills and frames are cleaned of splashes, and the area around the house is swept and washed down before the scaffold leaves. If anything is left that bothers you, tell the site lead the same day so it can be put right.
Can my children and pets use the garden during work?
Yes, away from the scaffold and the area being worked on. We will show you which areas to avoid each day.
The danger zone is around the base of the scaffold, where tools, materials and dust can fall, along with the mixing area and any skip. We mark these zones and move them as work goes round the house. Fresh render and some primers and bonding coats can irritate skin, and cement based products are alkaline, so keep small hands and paws away from buckets, mixing boards and wet walls. Dogs should be kept indoors or on a lead when the team is moving materials, and gates need to stay closed, so tell us about any pets that might slip out. Hacking off days are noisy and dusty, and on those days it is better to keep children and pets indoors with windows shut on that side. Ask the site lead each morning which part of the garden is clear.
Will you tell my neighbours about the work?
We recommend you let them know before work starts, especially if scaffold is close to their boundary. We are happy to drop a short note through their door too.
Neighbours are affected by noise, dust, deliveries and parking, and sometimes need to give access. If the scaffold has to stand on or over their land, their written agreement is needed before it goes up, and works that touch a shared wall may raise party wall questions worth checking early. A friendly conversation with the start date, expected length and a contact number avoids most complaints. We protect their windows, cars, paths and plants where splashes or dust could reach them, and keep shared paths and drives clear. Where your render meets a neighbour's brick or render on a semi, the junction needs agreeing so the edge looks tidy from both sides. If a neighbour has a concern during the job, ask them to speak to the site lead directly, so it can be sorted quickly.
What happens to the waste from hacking off?
It goes into skips or a load and go service and is disposed of at licensed facilities. We include waste removal in our quote.
Hacking off old render or pebbledash produces a large volume of heavy rubble, more than most people expect from a single wall. It is collected in a skip on the drive, a skip on the road with a council permit, or a load and go service where a lorry collects bagged or loose waste on the day, which suits narrow streets with no space for a skip. The waste is taken by licensed carriers to licensed facilities, where much of it is sorted and recycled. Older textured coatings can sometimes need testing before removal, so we look at any we find at the survey. All waste costs, including permits, are in the quote. Let us know about any bulky items you want removed as well, such as old trellis or a broken garden wall, so we can allow for them.
Can you work around my holidays?
Yes. Many clients go away while work is done. We just need access to the outside of the house and an agreed way to contact you.
Being away is often the easiest arrangement for everyone. Before you go, we agree the programme, a contact number and a backup contact, and how we will send updates and raise any decisions that come up, such as a hidden repair. Leave side gates unlocked or agree a key arrangement, and make sure outdoor power and an outside tap are available. Lock windows and doors, and tell your insurer and a trusted neighbour that work is going on. If stage payments fall due while you are away, set up a way to approve them from abroad. Bear in mind that weather can shift the programme by a few days, so the job may not finish on the exact day you return. We send photos of each stage so you can follow progress wherever you are.
Will you need to come inside my house?
Usually not, except to check windows or reach a few details. Most render work is done entirely from the outside.
The few times we need to come in are usually to check how windows open and close, to confirm cables or pipes that pass through the wall, or to look at internal signs of damp before rendering. We may also compare the internal floor level with the damp proof course outside. On EWI jobs, we may need to see where gas, electric and water meters, boiler flues and vents sit, because these have to be extended or adjusted through the new insulation. Any visit is arranged in advance, with shoes covered and floors protected. During the job, keep windows shut on the elevation being worked on to stop dust coming in, and close trickle vents if you can. If you have damp patches, cracks or mould inside, photograph them and send them before the survey, as they help us judge the wall.