Do the CDM regulations apply to house rendering?
Yes. The Construction (Design and Management) Regulations apply to domestic jobs too. For homeowners, most duties pass to the contractor, so we handle the planning, risk assessment and site safety.
Under CDM, a homeowner having work done on their own house is a domestic client, and the client duties pass to the contractor, or to the principal contractor where more than one trade is involved. In practice that means a construction phase plan is prepared before work starts, setting out how the scaffold, access, waste, deliveries, welfare facilities and working at height will be managed. Where the job is larger, for example render as part of an extension, the designer and principal contractor roles may sit with your architect or LINX Design and Build, and we work within their plan. You remain responsible for things in your control, such as giving accurate information about the house, including anything you know about asbestos, buried services or structural problems. When comparing contractors, ask each one how they will plan and manage safety on your particular job.
Is scaffold inspected?
Yes. Scaffold must be inspected by a competent person after erection, at regular intervals and after bad weather. Our scaffold contractors provide inspection records.
Health and safety rules require scaffold to be inspected before first use, at regular intervals during the job and after anything that could affect its stability, such as high winds or alterations. Each inspection is recorded, and most scaffolders tag the access points to show the date and that it is safe to use. Our scaffold contractors also design the scaffold around the job, with loading bays for materials, guardrails and toe boards, sheeting where needed and boarded lifts at the right heights for rendering. Only the scaffolder may alter the scaffold, so if a board or tie gets in the way, our team asks them back to adjust it. If you or your family need to pass under the scaffold, ask us where the safe route is, and keep children off it outside working hours. Access ladders are removed or boarded off at the end of each day.
What if my old render contains asbestos?
Asbestos in render is uncommon, but some older textured coatings may contain it. If it is suspected, a sample is tested first. Any asbestos found is removed by licensed specialists before rendering.
The materials most likely to contain asbestos on an outside wall are some older textured and decorative coatings, along with items often found on the same walls, such as soffits, flue pipes, panels under windows and old soil pipes. Render on its own rarely contains it, but on older houses any doubtful material is treated with caution until it has been tested. If we see something suspect at survey, we stop and recommend a sample is taken by a qualified asbestos surveyor and tested at a laboratory before any hacking off or drilling starts. If it comes back positive, the removal is carried out by licensed specialists, and only then do we begin our work. A test costs far less than dealing with contamination of a garden or a neighbour's property later. If you have an existing asbestos survey for the house, have it ready for us at the survey.
Is there lead in old paint on my walls?
Paint applied before about 1970 may contain lead. We avoid dry sanding old paint layers and use methods that keep dust down, rather than burning or sanding it off.
A painted wall on an older London house may carry several layers, with the oldest containing lead. It becomes a risk when it turns into dust or fumes, which is why we avoid dry sanding, power wire brushing and burning off. Where loose paint has to come off, it is scraped by hand while damp, collected on sheets and bagged instead of being swept or blown into the garden. Often most of the paint does not need removing at all, as a sound painted wall can be primed and overcoated with a basecoat and silicone render system, with only flaking areas scraped back. If you have young children or anyone in the house is pregnant, tell us at survey, and keep windows on the working elevation closed while preparation is under way. Home test kits for lead are available if you want certainty.
Is external wall insulation safe in a fire?
On houses, EPS systems that meet the building regulations are widely used. On taller residential buildings, building regulations guidance requires non combustible insulation such as mineral wool. We specify to suit your building's height and use.
Fire performance is judged on the whole system, including the insulation, adhesive, render and the details around openings. EPS is combustible, so on houses it relies on the render protecting it and on fire breaks where the guidance calls for them, such as bands of mineral wool at party walls between neighbouring properties. On taller residential buildings, the regulations limit the materials in external walls to non combustible types, which in practice means mineral wool insulation with a render that meets the same standard. Mineral wool such as Rockwool is non combustible on any building and suits owners who want that extra margin, though it is heavier and costs more. We also keep insulation clear of flues and boiler outlets and detail those carefully. If you live in a flat or a mixed use building, tell us the number of storeys at the start, as it changes the specification.
Do I need building control for external wall insulation?
Yes. External wall insulation is controlled work, so building control must be notified. We will explain the route for your job at survey.
Insulating an external wall counts as a thermal upgrade under Part L, and the work also has to satisfy the rules on fire, structure and moisture. There are two usual routes. Some installers are registered with a competent person scheme that lets them self certify qualifying work and notify the council on completion. Otherwise, an application is made to the local authority building control team or a registered private approver, who will inspect at key stages. Either way, you should end up with a completion certificate, which you will need when you sell, as buyers' solicitors ask for it. Rendering alone can also bring in the insulation requirement where render is renewed over more than half of a wall, or more than a quarter of the whole outer surface. We confirm at survey which route applies to your job and explain any fees before you commit.
Do you carry out risk assessments?
Yes. Every job has a risk assessment and method statement covering access, working at height, dust, noise and materials. On commercial jobs we issue these as part of the RAMS package.
The risk assessment looks at what could go wrong on your particular house, and the method statement sets out step by step how the work will be done safely. For a typical render job that covers scaffold access and loading, hacking off and dust, mixing and spraying, manual handling of bags and boards, use of power tools, protection of the public along the pavement, and keeping children and pets away from the work area. It also records where materials and waste will be stored, how deliveries arrive, and what happens if the weather turns. The team reads and signs it before starting, and it is updated if anything changes on site, such as finding suspect materials or poor brickwork behind old render. For commercial clients and main contractors, we issue the RAMS for approval before mobilising, along with the product data sheets and safety data sheets the site requires.
How do you control dust during hacking off?
We sheet the scaffold, use dust suppression, wear the right protective equipment and clear waste promptly. Neighbours' windows and cars are protected where the work is close.
Hacking off old render or pebbledash is the dustiest part of any render job, and much of that dust contains silica from sand and cement, which is harmful to breathe over time. The scaffold is wrapped in debris netting or sheeting on the working elevations so dust and fragments stay inside it. We damp down the wall while breaking it out, use tools with dust extraction where cutting is needed, and the team wears suitable masks, eye protection and hearing protection. Waste is bagged or dropped into skips and cleared regularly so it does not get blown around or walked through the house. We protect windows, doors, plants and paving with sheeting and boards, and tell neighbours in advance which days will be noisiest and dustiest. Keep windows and doors on that side of your house closed during hacking off, and bring washing in from the garden.
Is working near my power or phone lines a problem?
We check for overhead cables and service entries at survey. Where cables cross the wall, we work around them safely or arrange for them to be moved.
On many London houses the phone line, broadband cable or sometimes the power supply comes in at high level and crosses the wall near the eaves. These can be damaged by scaffold poles or snagged during rendering, so we note every cable and service entry at survey and plan around it. Phone and broadband cables are usually unclipped and held clear while we work, then refixed neatly to the finished render with sealed clips. Overhead power cables need far more care. The network operator can fit protective sleeves or reroute them temporarily, and this has to be booked well in advance. Gas pipes, meter boxes and electric meter cupboards also need attention, as on an EWI job they may need extending outwards to sit on the new face. If you plan to change broadband provider or move a cable, try to do it before the scaffold goes up.
What happens if someone is injured on my property during the work?
Our public liability insurance covers injury or damage caused by our work. We can send you insurance certificates before work starts.
Public liability cover is there for third parties, such as visitors or passers by, and for damage to property caused by our work, such as a dropped tool breaking a car windscreen. Scaffold contractors hold their own insurance for the scaffold they erect. Before work starts, ask for a copy of the certificate and check that the policy dates and the company name match the business you are contracting with. It is also sensible to tell your home insurer that major external work is happening, as some policies have conditions about scaffolding and building work. Accidents are best prevented in the first place, which is why the scaffold is boarded off at ground level, access ladders are removed at night and the work area is kept tidy. If anything does happen, report it to the site supervisor straight away so it can be recorded and dealt with properly.